Logo: Husky Terminal
TWP/CAP LOGIN

Terminal

Information about the Yard

Through investment in new equipment and talented people, we are building the premier terminal in the Pacific Northwest.

The Numbers

Icon: Berth Depth51'Berth Depth
Icon: Acres125+Yard Acres
Icon: Cranes8ZPMC
100 Gauge Cranes
Icon: Berth Length2,960'Berth Length
Icon: On-dock Rail Tracks22,793'On-dock Rail

Cranes

  • 8 ZPMC Cranes
  • 100 Gauge
  • 24 Rows Wide
  • 60’ between the legs

RTG

  • 4 Kone Hybrid-Electric
  • 8 Paceco-Mitsui
    (R99 Renewable Diesel)

F Lot

  • Off-dock truck queueing yard
  • 9 in-gate lanes
  • 3 weigh-in-motion scales

Reefer

  • 600 plugs
  • Ability to expand to 800
  • Ability to pretrip 150+ units/24hrs

Shore Power

  • Shore Power Completed 2025
  • Available at both berths
  • Green Energy
    (90% from hydroelectric power)

Rail

  • Premium PNW Rail Program
  • 22,793’ of Rail Track
  • Serviced by UP, BN and
    NWC Portland
  • Straddle Carrier Operation
Illustrated map of the Husky Terminal port and shipping yard

Related Pages

© 2026 Husky Terminal · Privacy · Terms · Careers · Site Design